8,118 steps
Our floors in the front apartment are all dug up. It looks way worse than before, but that's life with home renovations over here. Too busy for pictures or videos.
I ended up doing tons of sewing today. The bed in Le Catamaran needed a comforter and duvet cover. I had one of each, but they were both too big and both different sizes. So I decided to customize both to fit the bed exactly. This necessitated a trip to the fabric store since I was out of several colors of thread and velcro.
I rescued the duvet cover from the garbage several months ago (people often leave things there to give away). It turned out to be 100% linen in a color that matches the lime mortar exactly. And I had enough left over after resizing the duvet cover to make 4 pillowcases!
I also put 2 coats of finish on the staircase treads. I was going to do the final coat this evening but it was too busy with all of the other things going on. I'll do that in the morning and then the staircase will be useable starting on Sunday.
Dio and Zari both had evening soccer practices, and Eric is gone to a late night soccer match.
No comments:
Post a Comment